Dieser Beitrag ist leider nur in der italienischen Originalversion verfügbar.
Hier finden sie eine englische Kurzfassung:
This Technical Notebook describes the different kinds and the procedures for assembling, using, disassembling and maintaining of fixed scaffoldings. They belong to the so-called “provisional works”, and are used by workers to reach the various floors of a building.
Download | File |
---|
Ponteggi Fissi (italian version) | Download (5,4 MB) |
Contact |
---|
Barbara Manfredi, Elisabetta Badellino, Francesca R. Mignacca http://safety-work.org/ INAIL, Istituto Nazionale per l’Assicurazione contro gli Infortuni sul Lavoro, Direzione Centrale Prevenzione Piazzale Giulio Pastore 6 00144 Roma Italy
Tel.: (+39) 06/5487211 Fax: (+39) 06/54872075 E-Mail: b.manfredi@inail.it; e.badellino@inail.it; f.mignacca@inail.it http://www.inail.it |